Completion of the construction works on the student canteen and the dormitories, as well as the driveway at the new campus of the University of Zadar. The newly built dormitories are designed to accommodate 284 students in 129 rooms. In addition to the accommodation units, a canteen with a capacity of 500 seats and additional facilities were built and equipped, including a laundry room, three kitchenettes and recreation and study rooms.
As part of the project, TROMONT carried out the works on the water supply and wastewater disposal systems as well as the mechanical installation systems.